Close Menu
  • Home
  • News
  • Tech Jungle
  • RAWRMag
  • BIZnest
  • Brands
  • About
    • BE PART OF THE LIONHEARTV FAMILY!
    • THE PRIDE
    • ADVERTISE AT LIONHEARTV
What's Hot

Anton Vinzon to headline new GMA Afternoon Prime series ‘Kamao’

March 27, 2026

Kelvin Miranda, Robb Guinto join ‘TBATS on the Go’ this Sunday

March 27, 2026

GMA Kapuso Foundation continues aid to Catanduanes months after Super Typhoon Uwan

March 27, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram YouTube TikTok
LionhearTVLionhearTV
  • Home
  • News
  • Tech Jungle
  • RAWRMag
  • BIZnest
  • Brands
  • About
    • BE PART OF THE LIONHEARTV FAMILY!
    • THE PRIDE
    • ADVERTISE AT LIONHEARTV
LionhearTVLionhearTV
Home»Celeb Feature»Darren Espanto discusses impact of hosting ‘It’s Showtime’ on his career
Celeb Feature News Television

Darren Espanto discusses impact of hosting ‘It’s Showtime’ on his career

LionhearTVBy LionhearTVOctober 17, 2024No Comments2 Mins Read
Share
Facebook Twitter Reddit Pinterest Email

Singer and artist Darren Espanto shared his thoughts on how hosting the noontime variety show ‘It’s Showtime’ has transformed his career during a recent press conference.

The 22-year-old artist expressed his excitement and gratitude for being part of a show he has admired since childhood.

“Nine years old pa lang ako nung nanonood na ako ng Showtime, 15 years ago. To be [a] host now has really changed the trajectory of my career din po as well kasi nagsimula ako as a guest ‘tapos, naging hurado, naging host. Parang naging parte na rin po ako ng Showtime family throughout the years. Parang lumaki na rin ako rito sa It’s Showtime,” Darren stated. He recounted his journey from guest performer to judge and now a permanent host, noting the sense of belonging he feels within the Showtime family. “It’s really a great way also to reach a wider audience po. That’s how it changed my career,” he added.

In a heartfelt video message shared by ‘It’s Showtime,’ Darren thanked the audience for their support over the past 15 years and expressed his enthusiasm for the future. “I just want to thank all of you for being with us for 15 years,” he said.

Darren was officially introduced as one of the hosts during a contract signing between ABS-CBN and GMA Network on March 20, 2024. He will be performing alongside co-hosts Vhong Navarro, Amy Perez, and Ion Perez in the highly anticipated ‘Magpasikat 2024’ segment, set to run from October 21 to 25.

‘It’s Showtime’ airs from Monday to Saturday at 12 noon on GMA Network, GTV, A2Z, Kapamilya Channel, Kapamilya Online Live, AllTV and other platforms, continuing to engage audiences with its lively performances and variety of segments .

Comments

ABS-CBN Darren Espanto GMA Network It's Showtime
Share. Facebook Twitter Pinterest LinkedIn Reddit Email
Previous ArticleMVP Group’s Ideaspace Ventures adds five startups to portfolio with immediate investments
Next Article From the director of ‘Ju-On’ comes a new tale of horror. ‘SANA: Let Me Hear’ haunts PH cinemas on Nov 13
LionhearTV
  • Website
  • Facebook
  • X (Twitter)
  • Instagram

LionhearTV has always believed in what the everyday reader can contribute, and has always been open to receiving input, help, or leads on stories. Readers are always encouraged to drop us their thoughts either by either by leaving a comment on a post, or contact us directly – email us at lionheartvnet@gmail.com.

Related Posts

Anton Vinzon to headline new GMA Afternoon Prime series ‘Kamao’

March 27, 2026

Kelvin Miranda, Robb Guinto join ‘TBATS on the Go’ this Sunday

March 27, 2026

CJ Navato wins ‘Sing Galing: Sing-lebrity Edition’ grand finals

March 27, 2026

SB19 to drop new album ‘Wakas at Simula,’ teases global collaborations and concert finale

March 27, 2026
Add A Comment

Comments are closed.

Find us on Facebook
Blogmeter.Top



Trending

LionhearTV continues to grow: Strengthening BIZNest, Tech Jungle, and RAWRTrip for 2026

February 14, 2026

15 Adored PH Celebrity Loveteams That Eventually Parted Ways

February 2, 2026

25 Best Teleseryes of 2025

January 14, 2026

GMA Pictures rolls out ambitious 2026 film slate, highlights animated features and major industry collaborations

January 7, 2026

Invited but silent: Celebrities, Influencers face backlash for not promoting MMFF 2025 films

January 3, 2026
Showbiz News

SB19 to drop new album ‘Wakas at Simula,’ teases global collaborations and concert finale

March 27, 2026

Kim Molina, Jerald Napoles recall ‘first night’ as newlyweds: ‘First night, lasing kaming lahat’

March 27, 2026

Kelley Day recalls real-life pageant rivalry with friend

March 27, 2026

Yasser Marta admits falling for Robb Guinto during first love scene in ‘Desperada’

March 27, 2026

Imago unveils ‘Pasimple’ at Noctus Music Bar, marking a new chapter in OPM evolution

March 27, 2026
Most Viewed

Anton Vinzon to headline new GMA Afternoon Prime series ‘Kamao’

March 27, 2026

Kelvin Miranda, Robb Guinto join ‘TBATS on the Go’ this Sunday

March 27, 2026

GMA Kapuso Foundation continues aid to Catanduanes months after Super Typhoon Uwan

March 27, 2026

CJ Navato wins ‘Sing Galing: Sing-lebrity Edition’ grand finals

March 27, 2026

SB19 to drop new album ‘Wakas at Simula,’ teases global collaborations and concert finale

March 27, 2026
eMVP Digital is an online empire that useful pieces of information and a resource for a daily dose of entertainment in all forms. It produces LionhearTV.net, Dailypedia.net, RAWR Awards, RAWRMag, DailyPIPOL, and Broken Lion. These platforms have a highly-engaged audience per month, which varies from ages and sexes.



Blogmeter.Top
© 2026 LionhearTV.net.
  • Home
  • News
  • Tech Jungle
  • RAWRMag
  • BIZnest
  • Brands
  • About
    • BE PART OF THE LIONHEARTV FAMILY!
    • THE PRIDE
    • ADVERTISE AT LIONHEARTV

Type above and press Enter to search. Press Esc to cancel.