Close Menu
  • Home
  • News
  • Tech Jungle
  • RAWRMag
  • BIZnest
  • Brands
  • About
    • BE PART OF THE LIONHEARTV FAMILY!
    • THE PRIDE
    • ADVERTISE AT LIONHEARTV
What's Hot

LG Electronics Announces ‘Designed for LG Gaming Portal’ Certification Program for Controllers

February 26, 2026

Coco Martin and ‘FPJ’s Batang Quiapo’ Lead ABS-CBN Winners at 1st Philippine Academy of Film and Television Arts (Pafta) Awards

February 26, 2026

Sponge Cola and Gigi De Lana Join Forces for First-Ever Collaboration, ‘Naghihilom,’ Out this March 6

February 26, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram YouTube TikTok
LionhearTVLionhearTV
  • Home
  • News
  • Tech Jungle
  • RAWRMag
  • BIZnest
  • Brands
  • About
    • BE PART OF THE LIONHEARTV FAMILY!
    • THE PRIDE
    • ADVERTISE AT LIONHEARTV
LionhearTVLionhearTV
Home»Celeb Feature»Ruru Madrid’s camp sheds light on the issue regarding the event attended by ‘Lolong’ lead star, ‘Darna’ actress
Celeb Feature Events News Social Media

Ruru Madrid’s camp sheds light on the issue regarding the event attended by ‘Lolong’ lead star, ‘Darna’ actress

LarryBy LarryOctober 13, 2022No Comments2 Mins Read
Share
Facebook Twitter Reddit Pinterest Email

Camp of Ruru Madrid shed light on the issue regarding the event attended by Madrid and Jane De Leon.

On October 7, the Lolong actor and the Darna star performed at an event in Limay, Bataan.

The blind item claimed the latter insisted to the event organizers that she would appear last among the performers. It was also noted that when the De Leon finally got to the stage, much of the live audience had already left.

According to Madrid’s camp, the organizer made it clear that the Lolong star will be the last to perform.

“Sa program, last talaga si Ruru as advised by the organizer to us. Nung hinahanap na si Jane, they made excuses na. Kesyo wala pa raw sa venue si Jane, but apparently may van na kina Jane daw iyun.

“But what they said is wala raw doon si Jane, at papunta pa lang daw sila. Advanced party daw yun,” a Sparkle star, a talent of GMA 7, said.

The unnamed Sparkle star shared that it was almost time for De Leon to perform, but the Darna star was still not backstage.

“Nung malapit na matapos yung performer before Jane. They followed up. Ang sabi naman is hindi pa raw nakaayos si Jane at nagmi-makeup pa.”

The unnamed Sparkle star implied that De Leon’s camp was making reasons for the Darna star to be the one last to perform.

“Nung wala nang maisalang sa stage, Ruru politely offered na siya na lang daw mauna. Kasi, kawawa din yung mga tao na naghihintay.

“After the performance of Ruru, biglang ready na si Jane sa backstage,” the Sparkle star said.

The GMA Network adventure-drama series Lolong will have its second season.

Comments

Darna Jane De Leon Lolong Ruru Madrid
Share. Facebook Twitter Pinterest LinkedIn Reddit Email
Previous ArticleBINI, all set for ‘Feel Good’ album showcase at Skydome
Next Article Timberland Heights: Your home is your staycation
Larry
  • X (Twitter)
  • Instagram

Related Posts

Coco Martin and ‘FPJ’s Batang Quiapo’ Lead ABS-CBN Winners at 1st Philippine Academy of Film and Television Arts (Pafta) Awards

February 26, 2026

Sponge Cola and Gigi De Lana Join Forces for First-Ever Collaboration, ‘Naghihilom,’ Out this March 6

February 26, 2026

Joaquin Arce addresses ‘Nepo Baby’ claims on ‘Pinoy Big Brother Celebrity Collab 2.0’

February 26, 2026

Ashtine Olviga gets own drama anthology, dubbed ‘Phenomenal Star’

February 26, 2026
Add A Comment

Comments are closed.

Find us on Facebook
Blogmeter.Top



Trending

LionhearTV continues to grow: Strengthening BIZNest, Tech Jungle, and RAWRTrip for 2026

February 14, 2026

15 Adored PH Celebrity Loveteams That Eventually Parted Ways

February 2, 2026

25 Best Teleseryes of 2025

January 14, 2026

GMA Pictures rolls out ambitious 2026 film slate, highlights animated features and major industry collaborations

January 7, 2026

Invited but silent: Celebrities, Influencers face backlash for not promoting MMFF 2025 films

January 3, 2026
Showbiz News

Joaquin Arce addresses ‘Nepo Baby’ claims on ‘Pinoy Big Brother Celebrity Collab 2.0’

February 26, 2026

Ashtine Olviga gets own drama anthology, dubbed ‘Phenomenal Star’

February 26, 2026

Kylie Padilla clarifies “leaving the Philippines” remark, expresses trust in Robin Padilla

February 26, 2026

Dingdong Dantes, Iza Calzado lead oath-taking of Society of Philippine Entertainment Editors officers

February 26, 2026

Angel Aquino stands firm: ‘There’s no gender when it comes to love’

February 26, 2026
Most Viewed

LG Electronics Announces ‘Designed for LG Gaming Portal’ Certification Program for Controllers

February 26, 2026

Coco Martin and ‘FPJ’s Batang Quiapo’ Lead ABS-CBN Winners at 1st Philippine Academy of Film and Television Arts (Pafta) Awards

February 26, 2026

Sponge Cola and Gigi De Lana Join Forces for First-Ever Collaboration, ‘Naghihilom,’ Out this March 6

February 26, 2026

Joaquin Arce addresses ‘Nepo Baby’ claims on ‘Pinoy Big Brother Celebrity Collab 2.0’

February 26, 2026

Ashtine Olviga gets own drama anthology, dubbed ‘Phenomenal Star’

February 26, 2026
eMVP Digital is an online empire that useful pieces of information and a resource for a daily dose of entertainment in all forms. It produces LionhearTV.net, Dailypedia.net, RAWR Awards, RAWRMag, DailyPIPOL, and Broken Lion. These platforms have a highly-engaged audience per month, which varies from ages and sexes.



Blogmeter.Top
© 2026 LionhearTV.net.
  • Home
  • News
  • Tech Jungle
  • RAWRMag
  • BIZnest
  • Brands
  • About
    • BE PART OF THE LIONHEARTV FAMILY!
    • THE PRIDE
    • ADVERTISE AT LIONHEARTV

Type above and press Enter to search. Press Esc to cancel.