Close Menu
  • Home
  • News
  • Tech Jungle
  • RAWRMag
  • BIZnest
  • Brands
  • About
    • BE PART OF THE LIONHEARTV FAMILY!
    • THE PRIDE
    • ADVERTISE AT LIONHEARTV
What's Hot

Crunchyroll Celebrates Anime With Fans in Bangkok at AFA Thailand 2026

June 4, 2026

vivo V70 captures outdoor adventures like scenes from old memory

June 4, 2026

HONOR 600 Fever Takes Over Mall of Asia as Thousands of Fans Flock to First Day Sale Event

June 4, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram YouTube TikTok
LionhearTVLionhearTV
  • Home
  • News
  • Tech Jungle
  • RAWRMag
  • BIZnest
  • Brands
  • About
    • BE PART OF THE LIONHEARTV FAMILY!
    • THE PRIDE
    • ADVERTISE AT LIONHEARTV
LionhearTVLionhearTV
Home»Celeb Feature»Ruru Madrid’s camp sheds light on the issue regarding the event attended by ‘Lolong’ lead star, ‘Darna’ actress
Celeb Feature Events News Social Media

Ruru Madrid’s camp sheds light on the issue regarding the event attended by ‘Lolong’ lead star, ‘Darna’ actress

LarryBy LarryOctober 13, 2022No Comments2 Mins Read
Share
Facebook Twitter Reddit Pinterest Email

Camp of Ruru Madrid shed light on the issue regarding the event attended by Madrid and Jane De Leon.

On October 7, the Lolong actor and the Darna star performed at an event in Limay, Bataan.

The blind item claimed the latter insisted to the event organizers that she would appear last among the performers. It was also noted that when the De Leon finally got to the stage, much of the live audience had already left.

According to Madrid’s camp, the organizer made it clear that the Lolong star will be the last to perform.

“Sa program, last talaga si Ruru as advised by the organizer to us. Nung hinahanap na si Jane, they made excuses na. Kesyo wala pa raw sa venue si Jane, but apparently may van na kina Jane daw iyun.

“But what they said is wala raw doon si Jane, at papunta pa lang daw sila. Advanced party daw yun,” a Sparkle star, a talent of GMA 7, said.

The unnamed Sparkle star shared that it was almost time for De Leon to perform, but the Darna star was still not backstage.

“Nung malapit na matapos yung performer before Jane. They followed up. Ang sabi naman is hindi pa raw nakaayos si Jane at nagmi-makeup pa.”

The unnamed Sparkle star implied that De Leon’s camp was making reasons for the Darna star to be the one last to perform.

“Nung wala nang maisalang sa stage, Ruru politely offered na siya na lang daw mauna. Kasi, kawawa din yung mga tao na naghihintay.

“After the performance of Ruru, biglang ready na si Jane sa backstage,” the Sparkle star said.

The GMA Network adventure-drama series Lolong will have its second season.

Comments

Darna Jane De Leon Lolong Ruru Madrid
Share. Facebook Twitter Pinterest LinkedIn Reddit Email
Previous ArticleBINI, all set for ‘Feel Good’ album showcase at Skydome
Next Article Timberland Heights: Your home is your staycation
Larry
  • X (Twitter)
  • Instagram

Related Posts

Expelled Congressman Kiko Barzaga considers showbiz career following house ouster

June 3, 2026

TechLife Portable Monitor 15.6: A portable second screen designed to fit modern work, study, and entertainment needs

June 3, 2026

Evangeline Valencia crowned Mrs. Philippines International 2026

June 3, 2026

Isha Ponti opens her heart in new album ‘Likas’

June 3, 2026
Add A Comment

Comments are closed.

Find us on Facebook
Blogmeter.Top



Trending

SILOG Awards 2026 returns to honor Filipino online creators and digital mavericks

May 13, 2026

Lion With A Heart Year 9, from acts of giving to sustainable impact

April 28, 2026

LionhearTV continues to grow: Strengthening BIZNest, Tech Jungle, and RAWRTrip for 2026

February 14, 2026

15 Adored PH Celebrity Loveteams That Eventually Parted Ways

February 2, 2026

25 Best Teleseryes of 2025

January 14, 2026
Showbiz News

Expelled Congressman Kiko Barzaga considers showbiz career following house ouster

June 3, 2026

TechLife Portable Monitor 15.6: A portable second screen designed to fit modern work, study, and entertainment needs

June 3, 2026

Evangeline Valencia crowned Mrs. Philippines International 2026

June 3, 2026

Isha Ponti opens her heart in new album ‘Likas’

June 3, 2026

Fans rally behind Sir Geybin after hospitalization scare

June 3, 2026
Most Viewed

Crunchyroll Celebrates Anime With Fans in Bangkok at AFA Thailand 2026

June 4, 2026

vivo V70 captures outdoor adventures like scenes from old memory

June 4, 2026

HONOR 600 Fever Takes Over Mall of Asia as Thousands of Fans Flock to First Day Sale Event

June 4, 2026

GCash brings opportunities, innovation, and financial empowerment for the next wave of Filipino freelancers at the first regional community connect in Pampanga

June 4, 2026

HONOR Makes Back-to-School Shopping ‘Bongga’ with Big 6.6 Deals and Student Productivity Bundles

June 4, 2026
eMVP Digital is an online empire that useful pieces of information and a resource for a daily dose of entertainment in all forms. It produces LionhearTV.net, Dailypedia.net, RAWR Awards, RAWRMag, DailyPIPOL, and Broken Lion. These platforms have a highly-engaged audience per month, which varies from ages and sexes.



Blogmeter.Top
© 2026 LionhearTV.net.
  • Home
  • News
  • Tech Jungle
  • RAWRMag
  • BIZnest
  • Brands
  • About
    • BE PART OF THE LIONHEARTV FAMILY!
    • THE PRIDE
    • ADVERTISE AT LIONHEARTV

Type above and press Enter to search. Press Esc to cancel.